You’ve got the vision. You’ve got the brand. Now it’s time to bring it to life with signage that makes a statement.
But before anything gets installed, one crucial step ensures your project runs smoothly from day one: permitting.
At Image 212°, we don’t just design and install signs—we manage the entire process, start to finish, including the sometimes-overwhelming world of permits. It’s just one more way we go the extra degree to make your experience seamless and stress-free.
Why Sign Permitting Matters
Signage is an investment. It enhances your visibility, reinforces your brand, and draws in the right attention. But if it’s not appropriately permitted? You could face delays, fines, or even removal.
Every city has its own codes for signage—size, height, lighting, materials, and placement. Some properties require additional HOA or landlord approval. Your dream sign could get stuck in red tape without a strategic approach.
We make sure that doesn’t happen.
The Permitting Process
Permitting requirements vary, but most projects will include some combination of the following:
- Zoning + Code Compliance: Local ordinances determine everything from square footage to lighting restrictions.
- Landlord or Property Approvals: We’ll work within those guidelines if your business is in a managed space.
- Documentation + Submissions: We handle all drawings, structural calculations, and paperwork required for review.
- City Approvals + Inspections: From application to final inspection, we stay on top of every step so you don’t have to.
Permitting can feel overwhelming; that’s why we do it for you.
How Image 212° Simplifies the Process
We know permitting isn’t the most glamorous part of signage, but it is one of the most important. And when we lay a solid foundation, everything else flows with ease.
That’s why we handle it in-house. Our team understands regional code requirements, knows what documentation to submit, and maintains strong relationships with city offices and permitting departments.
Here’s what we take care of for you:
- Initial research and code checks
- Drawings, designs, and engineering documents
- Complete submission and communication with city or county offices
- Scheduling and passing final inspections
We make your signage experience easy and get your project approved, installed, and shining on schedule.
Get Ahead of the Process
Permitting timelines can vary depending on your city, property, and sign type. While we do everything possible to expedite the process, we always recommend starting early.
Here’s how you can help keep things moving:
- Engage us early: Loop us in before your build-out or renovation begins.
- Know your lease: Check for signage restrictions if you’re a tenant.
- Trust the experts: We’ll guide you through every requirement without overwhelming you.
Go the Extra Degree
Permitting might not be the most exciting part of your branding, but it’s the foundation your signage stands on.
At Image 212°, we go the extra degree to ensure your signage is stunning, fully approved, compliant, and built to last.
Let’s take your vision from concept to reality—with confidence, clarity, and zero guesswork.
Contact Image 212° today. Let’s get started.